Our Realizations 

2022 in Djerba 

Gantry crane Maintenance

 24/08/2022 

underwater cathodic protection inspection of anode

02/06/2022 * Port of Rades
Cutting of metal tube diam 1000 mm thickness 20 mm at dimension -13.42 NGT .

2022 Korbous BTM / SOTUTRASM

Pose of the accropods

BTM-EMGPTH /April 2022

Obstacle Removal Wagon Gate, Dam Sarrat ELKEF

2022 STEP Mahdia

Dredging and Laying of Pipes

BTM-EMGPTH /November 2021

Pier construction works

September - 2021 

Protection Works of the Supporting Elements of the Mobile Bridge of Bizerte

June 2021 Mahdia

Concrete bonding in place

 June 2021 Mahdia

Repair of leaks

August and September 2020 Hammem sousse and Chat mariem

"BTM" Repair and maintenance of inclined fire supports for ETEP

July 2020, El Hawria

Diffuser orifice activity after repair for ONAS


July 2020, El Haouaria

Repair of the treated water pipe of the Al-Hawaria sewerage station for ONAS


Dam of Sidi Salem  on 25/10/2019

Successful assembly and testing of the dam spillway cofferdam for SOCOMENIN SA


Rejich MAHDIA 25/08/2019 

Repair work on the pipes of the wastewater treatment plant for SOTUTRASM


Ben Ghayadha in Mahdia - Maintenance of anti-return valves

Ben Ghayadha in Mahdia for Tcm on 04/16/2019

Works to open the body of water with the sea 


Sidi Youssef Kerkaneh, Sfax on 11/12/2018

Extension of the port of Sidi Youssef Kerkaneh for SOTUTRASM


Sidi Mansour Sfax 2018

Construction fishing port sidi mansour sfax for SOTUTRASM


Port of La Goulette-Tunis July 2018 for Sté OMMP

Installation of geotextile dykes

Steps in the process of pumping concrete cement into bags of geotextiles under the blocks to fill the deep cavity.

Hotel Royal Salem SOUSSE ON 08/07/2018 

Installation and maintenance of the Thalassotherapy pipes for Hotel Royal Salem for APAL


Tabarka on April 2018

Sea mark work for the company Bedis under the supervision of APAL (Rocher Mérous 30m away)

Commercial port of Sousse November 2017

The process of lifting a stone from the bottom of the sea


Mahdia August 2017

The process of lifting the boat elbarka in the presentation of the coast of Mahdia


Thalasso Center TABARKA June 2017

Underwater works on the pipes of the TABARKA thalassotherapy center


Port of Rades 2016 - 2017

Works on quay number 6 Port de Rades for TCM


Port of Zarzona in Bizerte 2016

Extension of a new quay at the Port of Zarzona in Bizerte for ETEP


2014-2015 for TCM

Extension the Port of Cheeba Mahdia


Rades Jun 2015 for ETEP

Refloating, lifting and wreck removal


Port of Zarzis 2014 for TCM

Adjusting the Platform and Laying Blocks